Right now, there’s a lot of change going on inside Petrobras, reports note. First, word came out that the Albacora FPSO, a tender for mid-sized floating production operations, would not be ...
A month ago, Petrobras axed the bidding competition to contract an FPSO for the Albacora field after failing to reach a deal with BW Offshore and Ocyan. The operator is due next month to receive ...
Prio produced 86,200 bpd in March from the Frade, Albacora Leste and Polvo-Tubarao Martelo fields in the Campos basin.
This grid connection will allow us to bring our uptime at Albacora is in line with fair and cheap and most importantly, generate more bitcoin with the existing equipment at the site. We currently ...